I 90 WB over ST141 GRATTAN ST

.6 MI W. INT 5 G7A · County 013, Massachusetts · Built 1957 · 2 Lanes · 60,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C130204J5DOTNBI
Year Built
1957
Reconstructed
1995
Length
26.4 m (86.6 ft)
Max Span
24.8 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
60,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$43,000
Total Project Cost
$65,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.