I 90 EB over ST 33 MEMORIAL DR

MM 49.2 ON I-90 EB · County 013, Massachusetts · Built 1957 · 2 Lanes · 32,675 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C130184HWDOTNBI
Year Built
1957
Reconstructed
1992
Length
54.6 m (179.1 ft)
Max Span
15.6 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
32,675
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$979,000
Total Project Cost
$1,469,000