I 90 WB over HWY SHERIDAN ST

MM 49.5 ON I-90 WB · County 013, Massachusetts · Built 1957 · 2 Lanes · 25,732 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
C130174HVDOTNBI
Year Built
1957
Reconstructed
1993
Length
37.5 m (123 ft)
Max Span
18 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
25,732
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,380,000
Total Project Cost
$5,071,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.