ST 4 SB over US 3 NB/SB

2.2 MI N OF I 495 · County 017, Massachusetts · Built 2004 · 4 Lanes · 14,018 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
C0801985QDOTNBI
Year Built
2004
Length
50 m (164 ft)
Max Span
24 m
Width
21.4 m (70.2 ft)
Lanes
4
Daily Traffic
14,018
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,543,000
Total Project Cost
$3,815,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.