HWY STEADMAN ST over US 3

0.75 MI E DRUM HILL · County 017, Massachusetts · Built 2004 · 2 Lanes · 8,911 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
C080157D4DOTNBI
Year Built
2004
Length
74.8 m (245.4 ft)
Max Span
36.5 m
Width
15.3 m (50.2 ft)
Lanes
2
Daily Traffic
8,911
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$702,000
Total Project Cost
$1,054,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.