ST 4 NB over US 3 NB/SB

2.2 MI N OF I 495 · County 017, Massachusetts · Built 2004 · 4 Lanes · 14,416 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
C0801885UDOTNBI
Year Built
2004
Length
50 m (164 ft)
Max Span
24 m
Width
23.2 m (76.1 ft)
Lanes
4
Daily Traffic
14,416
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,113,000
Total Project Cost
$1,670,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.