US 3 NB over HWY RICHARDSON RD
0.75 MI NW DRUM HILL · County 017, Massachusetts · Built 2004 · 3 Lanes · 49,476 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.625517, -71.379608
This bridge is in worse condition than 9.4% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 22 years old.
Nearby Bridges
US 3 SB over HWY RICHARDSON RD
Built 2004
US 3 over WATER STONY BROOK
Built 1959
US 3 NB over RR BMRR
Built 2004
US 3 SB over RR BMRR
Built 2004
HWY SHORE DRIVE over WATER FREEMAN LAKE SPLWY
Built 1975
US 3 over WATER MOORES CANAL
Built 1959
ST 4 SB over US 3 NB/SB
Built 2004
HWY MEADOWBRK RD over WATER STONY BROOK
Built 2001
ST 3 A/PRNCETN ST over COMB BMRR & STONY BROOK
Built 1956
HWY MEADOWBRK RD over WATER CANAL
Built 1950
Bridge Details
- Structure #
- C08042AYCDOTNBI
- Year Built
- 2004
- Length
- 34.7 m (113.8 ft)
- Max Span
- 33.1 m
- Width
- 23.2 m (76.1 ft)
- Lanes
- 3
- Daily Traffic
- 49,476
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $529,000
- Total Project Cost
- $794,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.