US 3 over WATER STONY BROOK

1 MI NW DRUM HILL · County 017, Massachusetts · Built 1959 · 4 Lanes · 100,800 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
C080432GADOTNBI
Year Built
1959
Length
17.1 m (56.1 ft)
Max Span
5.2 m
Lanes
4
Daily Traffic
100,800
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,931,000
Total Project Cost
$4,397,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.