US 3 over WATER MOORES CANAL

1.4 MI NW DRUM HILL · County 017, Massachusetts · Built 1959 · 6 Lanes · 106,700 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
C080452GDDOTNBI
Year Built
1959
Length
8.8 m (28.9 ft)
Max Span
4.3 m
Lanes
6
Daily Traffic
106,700
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,525,000
Total Project Cost
$3,788,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.