US 3 NB over HWY MAIN ST

2 MI. NW DRUM HILL · County 017, Massachusetts · Built 2004 · 3 Lanes · 51,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
C080466G6DOTNBI
Year Built
2004
Length
32.7 m (107.3 ft)
Max Span
31.5 m
Width
24.5 m (80.4 ft)
Lanes
3
Daily Traffic
51,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$525,000
Total Project Cost
$788,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.