ST 3 A/PRNCETN ST over COMB BMRR & STONY BROOK

1.25 MI N DRUM HILL · County 017, Massachusetts · Built 1956 · 2 Lanes · 21,207 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
C080032MYDOT634
Year Built
1956
Reconstructed
2009
Length
26.8 m (87.9 ft)
Max Span
13.7 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
21,207
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,263,000
Total Project Cost
$1,895,000