US 3 NB over HWY PARKHURST RD

0.4 KM S. DRUM HIL · County 017, Massachusetts · Built 2004 · 4 Lanes · 100,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
C080178EGDOTNBI
Year Built
2004
Length
18.5 m (60.7 ft)
Max Span
16.7 m
Width
24.2 m (79.4 ft)
Lanes
4
Daily Traffic
100,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$299,000
Total Project Cost
$449,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.