I 93 SB ON RAMP over OTHER RELIEF

2 MI S OF JCT I90&I93 · County 025, Massachusetts · Built 1958 · 1 Lanes · 15,647 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B162593EHDOTNBI
Year Built
1958
Reconstructed
1984
Length
156.1 m (512.1 ft)
Max Span
25.9 m
Width
8.9 m (29.2 ft)
Lanes
1
Daily Traffic
15,647
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,072,000
Total Project Cost
$13,609,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.