HWY DORCHSTR AVE over COMB MBTA & RED LN
OVER RED LINE · County 025, Massachusetts · Built 1924 · 2 Lanes · 11,800 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
3
Serious
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 3 | Serious |
| Substructure | 6 | Satisfactory |
Location
42.326303, -71.05685
This bridge is in worse condition than 99.4% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 102 years old.
Nearby Bridges
HWY DORCHSTR AVE over RR MBTA SPUR
Built 1925
HWY DORCHSTR AVE over TR RED LINE (TUNNEL)
Built 1925
HWY DORCHSTR AVE over I 93 /US1/ST3
Built 1957
HWY BOSTON ST over I 93 /US1/ST3
Built 1958
HWY BOSTON ST over TR AMTRAK & RED LINE
Built 1977
HWY SOHAMPTN ST over COMB AMTRAK & RED LINE
Built 1902
HWY SOUTHMPTN ST over I 93 /US1/ST3
Built 1958
HWY COLUMBIA RD over COMB OLD COLNY&MBTA&RED
Built 1956
I 93 /US1/ST3 over COMB MBTA & COLUMBIA RD
Built 1958
I 93 NB OFF RAMP over COMB RED LINE & RELIEF
Built 1958
Bridge Details
- Structure #
- B161294VMMBTNBI
- Year Built
- 1924
- Reconstructed
- 1975
- Length
- 29.9 m (98.1 ft)
- Max Span
- 27.4 m
- Width
- 18.3 m (60 ft)
- Lanes
- 2
- Daily Traffic
- 11,800
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Other State Agencies
- Last Inspected
- N/A
- Est. Improvement
- $6,583,000
- Total Project Cost
- $9,875,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.