HWY BOSTON ST over I 93 /US1/ST3

2.4 KM S OF JCT I90&93 · County 025, Massachusetts · Built 1958 · 4 Lanes · 14,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B162663F7DOTNBI
Year Built
1958
Reconstructed
1987
Length
46.6 m (152.9 ft)
Max Span
22.3 m
Width
18.9 m (62 ft)
Lanes
4
Daily Traffic
14,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,250,000
Total Project Cost
$10,876,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.