HWY COLUMBIA RD over COMB OLD COLNY&MBTA&RED

1.6 KM E OF ST RTE 3 · County 025, Massachusetts · Built 1956 · 4 Lanes · 82,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B161304ERDOTNBI
Year Built
1956
Reconstructed
1983
Length
64.9 m (212.9 ft)
Max Span
36.6 m
Width
21.9 m (71.9 ft)
Lanes
4
Daily Traffic
82,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,242,000
Total Project Cost
$13,864,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.