HWY MORRSSEY BLV over HWY MT VERNON ST
.16 KM W OF I 93 · County 025, Massachusetts · Built 1925 · 4 Lanes · 41,500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
42.320908, -71.050942
This bridge is in worse condition than 1.6% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 101 years old.
Nearby Bridges
HWY COLUMBIA RD over COMB OLD COLNY&MBTA&RED
Built 1956
I 93 NB OFF RAMP over COMB RED LINE & RELIEF
Built 1958
I 93 /US1/ST3 over COMB MBTA & COLUMBIA RD
Built 1958
I 93 SB ON RAMP over OTHER RELIEF
Built 1958
I 93 /US1/ST3 over RR CSX SPUR
Built 1958
HWY DORCHSTR AVE over I 93 /US1/ST3
Built 1957
HWY DORCHSTR AVE over COMB MBTA & RED LN
Built 1924
HWY DORCHSTR AVE over RR MBTA SPUR
Built 1925
HWY DORCHSTR AVE over TR RED LINE (TUNNEL)
Built 1925
HWY BOSTON ST over I 93 /US1/ST3
Built 1958
Bridge Details
- Structure #
- B161964F5DOTNBI
- Year Built
- 1925
- Reconstructed
- 2010
- Length
- 33.5 m (109.9 ft)
- Max Span
- 28 m
- Width
- 16.3 m (53.5 ft)
- Lanes
- 4
- Daily Traffic
- 41,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,974,000
- Total Project Cost
- $5,962,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.