HWY DORCHSTR AVE over TR RED LINE (TUNNEL)

0.3 MI S OF EXIT 16 I-93 · County 025, Massachusetts · Built 1925 · 2 Lanes

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B161298MQMBTNBI
Year Built
1925
Length
13.7 m (44.9 ft)
Max Span
11.7 m
Width
18.3 m (60 ft)
Lanes
2
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$1,664,000
Total Project Cost
$2,497,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.