HWY SOUTHMPTN ST over I 93 /US1/ST3

1.1 KM S OF JCT I90&93 · County 025, Massachusetts · Built 1958 · 2 Lanes · 32,327 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B162723F6DOTNBI
Year Built
1958
Reconstructed
1983
Length
84.7 m (277.9 ft)
Max Span
27.7 m
Width
21.3 m (69.9 ft)
Lanes
2
Daily Traffic
32,327
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,754,000
Total Project Cost
$17,632,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.