HWY FRONTAGE RD over OTHER RELIEF
AT SO BOSTON BYPASS RD. · County 025, Massachusetts · Built 1998 · 4 Lanes · 38,534 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.333917, -71.063758
This bridge is in worse condition than 24.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 28 years old.
Nearby Bridges
HWY FRNT RD NB over OTHER RELIEF
Built 2000
HWY FRNT RD NB over OTHER RELIEF
Built 2000
HWY S BOS BPS RD over OTHER RELIEF
Built 1998
HWY S BOS BPS RD over I 93
Built 1998
HWY S BOS BPS RD over OTHER RELIEF
Built 1998
HWY S BOS BPS RD over OTHER RELIEF
Built 1998
HWY FRNT RD SB over OTHER RELIEF
Built 1997
HWY S BOS BYPASS over HWY WYDETT CIR ACC RD
Built 1995
HWY FRNT RD NB over HWY RAMP K
Built 2000
HWY S BOS BYPASS over COMB AMTRAK/MBTA&RED LN
Built 1995
Bridge Details
- Structure #
- B16644929DOTNBI
- Year Built
- 1998
- Length
- 15.9 m (52.2 ft)
- Max Span
- 14.8 m
- Width
- 19.3 m (63.3 ft)
- Lanes
- 4
- Daily Traffic
- 38,534
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,147,000
- Total Project Cost
- $1,721,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.