HWY FRNT RD SB over OTHER RELIEF

BYPASS RD INT. · County 025, Massachusetts · Built 1997 · 2 Lanes · 36,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B1664891HDOTNBI
Year Built
1997
Length
198.9 m (652.6 ft)
Max Span
23.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
36,200
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,333,000
Total Project Cost
$20,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.