HWY MASS AVE over OTHER RELIEF

MASS AVE. INT. · County 025, Massachusetts · Built 2000 · 4 Lanes · 69,827 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B16660918DOTNBI
Year Built
2000
Length
14.3 m (46.9 ft)
Max Span
13.7 m
Width
15.4 m (50.5 ft)
Lanes
4
Daily Traffic
69,827
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,426,000
Total Project Cost
$2,140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.