HWY MASS AV CONN over OTHER RELIEF

MASS AVE. INT. · County 025, Massachusetts · Built 2000 · 4 Lanes · 42,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B1664991GDOTNBI
Year Built
2000
Length
63.7 m (209 ft)
Max Span
22.9 m
Width
19.4 m (63.6 ft)
Lanes
4
Daily Traffic
42,900
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,491,000
Total Project Cost
$5,237,000