HWY FRNT RD NB over OTHER RELIEF
MASS AVE. INT. · County 025, Massachusetts · Built 2000 · 4 Lanes · 49,913 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.333925, -71.063781
This bridge is in worse condition than 24.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 26 years old.
Nearby Bridges
HWY FRNT RD NB over OTHER RELIEF
Built 2000
HWY FRONTAGE RD over OTHER RELIEF
Built 1998
HWY S BOS BPS RD over OTHER RELIEF
Built 1998
HWY S BOS BPS RD over I 93
Built 1998
HWY S BOS BPS RD over OTHER RELIEF
Built 1998
HWY S BOS BPS RD over OTHER RELIEF
Built 1998
HWY FRNT RD SB over OTHER RELIEF
Built 1997
HWY S BOS BYPASS over HWY WYDETT CIR ACC RD
Built 1995
HWY FRNT RD NB over HWY RAMP K
Built 2000
HWY MASS AVE over OTHER RELIEF
Built 2000
Bridge Details
- Structure #
- B1664791KDOTNBI
- Year Built
- 2000
- Length
- 45.4 m (149 ft)
- Max Span
- 22.5 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 4
- Daily Traffic
- 49,913
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,096,000
- Total Project Cost
- $10,645,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.