HWY FRNT RD NB over OTHER RELIEF

MASS AVE. INT. · County 025, Massachusetts · Built 2000 · 4 Lanes · 42,672 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B1664691PDOTNBI
Year Built
2000
Length
73.1 m (239.8 ft)
Max Span
18.4 m
Width
17.5 m (57.4 ft)
Lanes
4
Daily Traffic
42,672
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,801,000
Total Project Cost
$14,702,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.