HWY DORCHSTR AVE over I 93 /US1/ST3

2.4 KM SE OF JET I93&I90 · County 025, Massachusetts · Built 1957 · 2 Lanes · 10,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B16256398DOTNBI
Year Built
1957
Reconstructed
1988
Length
65.8 m (215.9 ft)
Max Span
31.7 m
Width
18.9 m (62 ft)
Lanes
2
Daily Traffic
10,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,234,000
Total Project Cost
$1,852,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.