HWY MORRSSEY BLV over WATER PATTENS COVE

.48 KM W OF U OF MASS · County 025, Massachusetts · Built 1973 · 7 Lanes · 54,957 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B164594FADOTNBI
Year Built
1973
Reconstructed
2010
Length
9.3 m (30.5 ft)
Max Span
8.4 m
Width
47.5 m (155.8 ft)
Lanes
7
Daily Traffic
54,957
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$219,000
Total Project Cost
$329,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.