HWY SAVIN HLL AV over TR RED LINE

0.2M E DORCHESTER AVE · County 025, Massachusetts · Built 1925 · 2 Lanes · 6,700 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
B162614VVMBTNBI
Year Built
1925
Reconstructed
1967
Length
25.2 m (82.7 ft)
Max Span
12.5 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
6,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$2,684,000
Total Project Cost
$4,027,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.