HWY FOUNTAIN ST over RR MBTA/CSX

.1 MI. N. OF ST-135 · County 017, Massachusetts · Built 2001 · 2 Lanes · 4,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
A14011AE1DOT634
Year Built
2001
Length
37.2 m (122 ft)
Max Span
16.8 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
4,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,902,000
Total Project Cost
$4,354,000