HWY FRONT ST over WATER SUDBURY RIVER

.1 MI. N. OF ST-135 · County 017, Massachusetts · Built 1880 · 2 Lanes · 7,170 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
A14003241MUNNBI
Year Built
1880
Reconstructed
1930
Length
12.7 m (41.7 ft)
Max Span
11 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
7,170
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$828,000
Total Project Cost
$1,243,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.