ST135 UNION ST over WATER SUDBURY RIVER

200 FT E. OF CHESTNUT ST · County 017, Massachusetts · Built 2012 · 3 Lanes · 11,728 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
A14002B7VDOTNBI
Year Built
2012
Length
19.5 m (64 ft)
Max Span
17.3 m
Width
16 m (52.5 ft)
Lanes
3
Daily Traffic
11,728
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,126,000
Total Project Cost
$3,190,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.