ST135 UNION ST over WATER SUDBURY RIVER

2.5 MI W OF 126 & 135 · County 017, Massachusetts · Built 1900 · 2 Lanes · 11,481 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
A1400128ADOTNBI
Year Built
1900
Reconstructed
1955
Length
28 m (91.9 ft)
Max Span
15.8 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
11,481
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,749,000
Total Project Cost
$4,124,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.