HWY MYRTLE ST over WATER SUDBURY RIVER

.5 MI N OF ST-135 · County 017, Massachusetts · Built 1924 · 2 Lanes · 7,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
A14005242MUNNBI
Year Built
1924
Length
8.2 m (26.9 ft)
Max Span
7.6 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
7,000
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$544,000
Total Project Cost
$817,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.