HWY CONCORD ST over WATER SUDBURY RIVER
.2 MI NORTH OF FRONT ST · County 017, Massachusetts · Built 1920 · 2 Lanes · 1,551 vehicles/day
Overall
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.262103, -71.463361
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 106 years old.
Nearby Bridges
HWY MYRTLE ST over WATER SUDBURY RIVER
Built 1924
HWY FRONT ST over WATER SUDBURY RIVER
Built 1880
ST135 UNION ST over WATER SUDBURY RIVER
Built 2012
HWY FOUNTAIN ST over RR MBTA/CSX
Built 2001
ST135 UNION ST over WATER SUDBURY RIVER
Built 1900
HWY CORDAVLLE RD over WATER SUDBURY RIVER
Built 1870
HWY HIGH ST over RR MBTA/CSX
Built 1999
HWY FOUNTAIN ST over WATER RESERVOIR 2
Built 1890
HWY WINTER ST over RR MBTA/CSX
Built 2017
HWY HOWE ST over WATER SUDBURY RIVER
Built 1990
Bridge Details
- Structure #
- A1400425HMUNNBI
- Year Built
- 1920
- Length
- 10.2 m (33.5 ft)
- Max Span
- 10.2 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 1,551
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $915,000
- Total Project Cost
- $1,373,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.