HWY HOWE ST over WATER SUDBURY RIVER

1MI. N OF HOPKINTON TL. · County 017, Massachusetts · Built 1990 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
A1400825KMUNNBI
Year Built
1990
Length
32 m (105 ft)
Max Span
29.6 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$926,000
Total Project Cost
$1,390,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.