I 90 EB over HWY WOODLAND RD

I-90 MM 109.3 · County 027, Massachusetts · Built 1957 · 3 Lanes · 51,120 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
S200244NMDOTNBI
Year Built
1957
Reconstructed
2021
Length
12.1 m (39.7 ft)
Max Span
10.8 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
51,120
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.