I 90 WB over ST 85 CORDAVILLE RD

I-90 MM 108.7 · County 027, Massachusetts · Built 2021 · 3 Lanes · 50,878 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
S20023C84DOTNBI
Year Built
2021
Length
22.9 m (75.1 ft)
Max Span
21.5 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
50,878
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.