HWY BRIDGE ST over RR MBTA/CSX

.6 MI W OF ST-85 · County 027, Massachusetts · Built 1900 · 2 Lanes · 900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S2001423LDOT634
Year Built
1900
Reconstructed
2014
Length
18.9 m (62 ft)
Max Span
17.1 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
900
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,984,000
Total Project Cost
$2,977,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.