HWY FOUNTAIN ST over RR MBTA/CSX

.1 MI N OF ST-135 · County 017, Massachusetts · Built 1900 · 2 Lanes · 9,376 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
F0701629HDOT634
Year Built
1900
Reconstructed
2011
Length
26.9 m (88.3 ft)
Max Span
25.3 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
9,376
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,189,000
Total Project Cost
$7,784,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.