HWY HERBERT ST over WATER BEAVER DAM BROOK

AT CORNER OF TRIPP ST. · County 017, Massachusetts · Built 2009 · 2 Lanes · 8,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F07029B7MMUNNBI
Year Built
2009
Length
9.7 m (31.8 ft)
Max Span
8.7 m
Width
15.3 m (50.2 ft)
Lanes
2
Daily Traffic
8,300
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$390,000
Total Project Cost
$586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.