EB CD TO IL 3 SB "" over UPRR

PIER D11-> PIER O-17 · County 163, Illinois · Built 1972 · 2 Lanes · 7,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
082020200000000
Year Built
1972
Reconstructed
2004
Length
242 m (794 ft)
Max Span
36.9 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
7,100
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,556,000
Total Project Cost
$1,712,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.