I-55/64 WB CD ""A"" over UPRR O2 B C H 4 ESL sts

PIER A1 TO ABUT A46 · County 163, Illinois · Built 1968 · 2 Lanes · 3,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
082014100000000
Year Built
1968
Reconstructed
2008
Length
1381 m (4530.8 ft)
Max Span
47.2 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
3,600
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$25,120,000
Total Project Cost
$37,680,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.