WB CD TO IL3SB ""O1 over UPRR Access Roads UPRR

PIER G1 TO ABUT O-10 · County 163, Illinois · Built 1971 · 2 Lanes · 5,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
082020100000000
Year Built
1971
Reconstructed
2004
Length
304.5 m (999 ft)
Max Span
39.6 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
5,800
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,958,000
Total Project Cost
$2,154,000