IL3NB TO 55/64WB "" over UPRR A B C IL 3 SB Ramp

PIER P1 TO PIER A5 · County 163, Illinois · Built 1969 · 1 Lanes · 4,950 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
082014500000000
Year Built
1969
Reconstructed
2004
Length
475.2 m (1559.1 ft)
Max Span
40.8 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
4,950
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,056,000
Total Project Cost
$3,362,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.