IL 3 NB TO EB CD "" over I-55/64 EB CD ""D"" & UPRR

PIER P1 TO PIER H1 · County 163, Illinois · Built 1972 · 1 Lanes · 2,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
082020300000000
Year Built
1972
Reconstructed
2004
Length
449.6 m (1475.1 ft)
Max Span
37.2 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
2,800
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.