I-55/64 CD WB ""G"" over Trendley Avenue

PIER G1 TO ABUT G14 · County 163, Illinois · Built 1968 · 2 Lanes · 8,850 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
082025400000000
Year Built
1968
Reconstructed
1997
Length
379.9 m (1246.4 ft)
Max Span
35.4 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
8,850
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.