I-55/64 EB CD ""D"" over UPRR O2 8th9th10th Piggo
PIER D1 TO ABUT D46 · County 163, Illinois · Built 1969 · 2 Lanes · 24,300 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
38.616803, -90.178456
This bridge is in worse condition than 74.8% of bridges in County 163. The average bridge in Illinois is 0 years old; this one is 57 years old.
Nearby Bridges
I-55/64; US 40 PSC over TRRA
Built 1966
I-55/64EB mainlne"" over UPRR IL 3 ramp UPRR UPRR
Built 1995
I-55/64WB mainlne"" over UPRR IL 3 Ramp UPRR UPRR
Built 1995
PSB I-55 64;US 40 over MISSISSIPPI RIVER
Built 1963
EB CD TO IL 3 SB "" over UPRR
Built 1972
IL3NB TO 55/64WB "" over UPRR A B C IL 3 SB Ramp
Built 1969
WB CD TO IL3 SB ""0 over GROUND
Built 1971
IS 55 S over CST S LENORE K SULLIVA
Built 1963
IL 3 NB Ramp ""F"" P over Abandoned Southern RR
Built 1971
I-55/64 WB CD ""A"" over UPRR O2 B C H 4 ESL sts
Built 1968
Bridge Details
- Structure #
- 082014400000000
- Year Built
- 1969
- Reconstructed
- 2021
- Length
- 1354.5 m (4443.9 ft)
- Max Span
- 41.8 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 24,300
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $239,976,000
- Total Project Cost
- $258,876,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.