I-55/64 EB CD ""D"" over UPRR O2 8th9th10th Piggo

PIER D1 TO ABUT D46 · County 163, Illinois · Built 1969 · 2 Lanes · 24,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
082014400000000
Year Built
1969
Reconstructed
2021
Length
1354.5 m (4443.9 ft)
Max Span
41.8 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
24,300
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$239,976,000
Total Project Cost
$258,876,000