I-55/64; US 40 PSC over TRRA
P6(PSB) to Pier BC1 · County 163, Illinois · Built 1966 · 8 Lanes · 113,200 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 8 | Very Good |
Location
38.617239, -90.180008
This bridge is in worse condition than 90.9% of bridges in County 163. The average bridge in Illinois is 0 years old; this one is 60 years old.
Nearby Bridges
I-55/64 EB CD ""D"" over UPRR O2 8th9th10th Piggo
Built 1969
PSB I-55 64;US 40 over MISSISSIPPI RIVER
Built 1963
I-55/64EB mainlne"" over UPRR IL 3 ramp UPRR UPRR
Built 1995
I-55/64WB mainlne"" over UPRR IL 3 Ramp UPRR UPRR
Built 1995
IS 55 S over CST S LENORE K SULLIVA
Built 1963
EB CD TO IL 3 SB "" over UPRR
Built 1972
IS 64 W over IS 44 CST 4TH ST CST
Built 1964
IS 64 E over IS 44 CST 4TH ST CST
Built 1964
IL3NB TO 55/64WB "" over UPRR A B C IL 3 SB Ramp
Built 1969
WB CD TO IL3 SB ""0 over GROUND
Built 1971
Bridge Details
- Structure #
- 082000500000000
- Year Built
- 1966
- Reconstructed
- 1991
- Length
- 260.9 m (856 ft)
- Max Span
- 49.1 m
- Width
- 34.4 m (112.9 ft)
- Lanes
- 8
- Daily Traffic
- 113,200
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $12,679,000
- Total Project Cost
- $12,741,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.