IS 64 E over IS 44 CST 4TH ST CST

S 23 T 45 N R 7 E · County 510, Missouri · Built 1964 · 2 Lanes · 34,244 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
1245
Year Built
1964
Length
2391.8 m (7847.1 ft)
Max Span
75.6 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
34,244
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$79,775,000
Total Project Cost
$119,662,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.