I-55/64EB mainlne"" over UPRR IL 3 ramp UPRR UPRR

PIER BC1 TO ABUT C31 · County 163, Illinois · Built 1995 · 2 Lanes · 56,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
082025100000000
Year Built
1995
Length
938.8 m (3080.1 ft)
Max Span
42.1 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
56,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$159,804,000
Total Project Cost
$159,829,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.